PROJECTS
Layout Optimization
Turbogenerator (TG) building of a 2x660MW coal based power project was optimized to reduce cost without compromising operational requirements.
Cost Optimization
-
Civil and Structures quantities of a 2x660MW supercritical coal power project were optimized by applying benchmarking, alternate design & materials and value engineering principles.
-
Civil and Structures quantities of a Coal Handling Plant for a 3x800MW super critical coal based power project were optimized by applying benchmarking, alternate design & materials and value engineering principles.
Cost Optimization
Optimization of Civil works quantities for a Flue Gas Desuphurization facility retrofitting into an operating power station of 4x500MW. Optimization was achieved by applying alternate designs & value engineering principles.
Cost Optimization
Optimization of Civil works including ground improvement for Rail Corridor and Freight Infrastructure facilities for an international project. Optimization was achieved by applying alternate designs & value engineering principles.
Benchmarking
Price benchmarking done for various works and supply packages for 2x660MW and 3x800MW coal based power projects.
Tender design & cost estimation
Tender design was carried out for an Ash Handling Plant of a 2x660MW coal based power project. Project cost was also estimated.
Component Costing
Component level costing was done for the Control and Electrics for EoT Cranes for application in steel plant.
Solar PV Projects
Roof top solar PV projects of capacity 9kW were installed on EPC basis